**Peer Review Journal ** DOI on demand of Author (Charges Apply) ** Fast Review and Publicaton Process ** Free E-Certificate to Each Author

Current Issues
     2026:7/2

International Journal of Multidisciplinary Research and Growth Evaluation

ISSN: (Print) | 2582-7138 (Online) | Impact Factor: 9.54 | Open Access

The Influence of Time Management Quality on the Timeliness Story Private House Construction Project Using the Critical Path Method

Full Text (PDF)

Open Access - Free to Download

Download Full Article (PDF)

Abstract

This research investigates how the quality time management affect the time delivery of a two-floor private house project in Samarinda. Using the Critical Path Method, efficient time management is an important thing as it directly impacts project cost, quality, and client satisfaction. CPM was used in this research to spot tasks that might delay the project. Data collection involved observation, interviews, and documentation, which were then analyzed using a project network diagram. The conclusions reveal that this project can be shortened from 458 to 383 days through the optimalization of critical activities which resulting in a 16.38%-time efficiency without reducing construction quality. This study also identifies common challenges encountered on-site, such as limited resources, mid-project design changes, and external interferences.

How to Cite This Article

Surahman, Heldina Pristanti, Della OC Kalangit, Regina Syavitri, Ayu Maharani, Tandi Kadang (2025). The Influence of Time Management Quality on the Timeliness Story Private House Construction Project Using the Critical Path Method . International Journal of Multidisciplinary Research and Growth Evaluation (IJMRGE), 6(4), 71-76. DOI: https://doi.org/10.54660/.IJMRGE.2025.6.4.71-76

Share This Article: