**Peer Review Journal ** DOI on demand of Author (Charges Apply) ** Fast Review and Publicaton Process ** Free E-Certificate to Each Author

Current Issues
     2026:7/2

International Journal of Multidisciplinary Research and Growth Evaluation

ISSN: (Print) | 2582-7138 (Online) | Impact Factor: 9.54 | Open Access

Application of Project Management with the CPM Method in a House Construction Project

Full Text (PDF)

Open Access - Free to Download

Download Full Article (PDF)

Abstract

This study aims to apply the CPM in planning and controlling a one-story house construction project in Samarinda City. CPM is used to identify the critical path, which is a series of activities that have no float and directly affect the duration of project completion. The research method used was descriptive quantitative with a case study approach. Data was collected through field observations, structured interviews, and analysis of project documents such as the Cost Budget Plan (RAB) and time schedule. The results of the analysis showed that CPM was able to arrange the sequence of activities logically, determine the start and finish time of each activity, and identify the critical path with a total duration of 77 days. These findings show that CPM is effective in improving project time efficiency, optimizing resource allocation, and minimizing the risk of delays. The application of this method makes a real contribution to more structured construction planning, especially in small-medium scale projects such as the construction of a one-story house. 

How to Cite This Article

Hamdani, Sarwo Eddy Wibowo, Farah Damayanti, Keni P Putri, Tiara O Hutapea (2025). Application of Project Management with the CPM Method in a House Construction Project . International Journal of Multidisciplinary Research and Growth Evaluation (IJMRGE), 6(4), 141-146.

Share This Article: